Well, I've laid the "one piece road" in place and it
fits great.
Painting the lines took me another 20 minutes...
I cut the road at the grade crossing the same way
as I did before and it fit the first time. All I have
left here is to detail the edges of the road(s) and the
parking lot at the top of the hill with ground foam
and bushes.